精品一区二区三区三区,人妻少妇精品视频一区二区三区,西西人体44www大胆无码,久久久精品中文字幕麻豆发布,亚洲精品国产suv一
Welcome to the official website of Guangdong Yongtong Crane Machinery Co.,Ltd

Yongtong Machinery

Guangdong Yongtong Crane Machinery Co.,Ltd Professional intelligent lifting solution service provider
0757-23357118 0757-23832122

Performance characteristics and application of LH electric hoist bridge crane

2023-02-15

LH electric hoist bridge crane is an bridge crane used to lift and transport heavy equipment and materials along the horizontal beam. It is mainly used in factories, warehouses and other industrial environments.
20t葫蘆雙梁起重機(jī)
20t hoist double-beam crane

The capacity of the LH electric hoist bridge crane can reach 20 tons and the maximum span can reach 35 meters. It has a high-power motor and is equipped with a series of safety functions to protect the crane and operator. The electric hoist is designed for fast and efficient lifting and transportation, with adjustable speed and torque settings and effective braking system. The LH electric hoist bridge crane is equipped with a series of sensors and monitoring systems, which can provide feedback on the crane performance and ensure the safe and efficient operation of the crane.

Performance parameters: maximum lifting capacity: 10-500T, working height: A3-A4, lifting speed: 8-20m/min, trolley running speed: 20m/min, crane running speed: 20m/min.

The LH electric hoist bridge crane also has many additional functions, such as adjustable lifting limit and shock absorber, to help protect the crane and its operator. In addition, LH electric hoist bridge crane can also be installed with other accessories, such as cantilever crane or weighing system, to enable it to perform specific tasks.

Precautions for operation of LH electric hoist bridge crane: operators must strictly abide by the operating instructions, and wear safety helmets and fasten safety belts when operating the crane. The operator should check the crane before operation and put the brake block in the correct position. When driving, the speed shall not exceed the rated speed. The crane shall not exceed the rated load and the lifting height shall not exceed the rated lifting height. The crane shall not be overloaded.